Download details
CSOs Call for Accelerating Implementation of Sustainable Energy for All (SE4ALL) in Tanzania in Order to Close the Energy Gap HOT

The implementation of the Tanzania SE4ALL AA was planned to be on four stages to allow continuous review, and for the development of several IPs that are tailored to address specific issues. These stages include; Transition (2015-2016), Transformation/operationalization (2016-2020), Consolidation (2020-2025) and Acceleration (2025-2030).

During transition period, the main focus was on integrating the AA and IP into the government mid-term planning process by incorporating them into the Ministry of Energy (MoE) Five-year Strategic Plan (2016–2020). As part of that process, the government was to start a national dialogue with all stakeholders at national and sub-national level towards the adaptation, updating and alignment of the existing initiatives with the country’s SE4ALL AA; which was not done

Data
Created 2020-04-15
Changed 2022-06-20
Version
Size 345.49 KB
Author
MD5 Checksum 94493d5ef447220e88aed7eef4f59b8c
Created by Webmaster
Changed by Webmaster
Downloads 269
License
Price
Website
SHA1 Checksum 6467c11596faa938e281480b3cb539e34e2080ff




2022 © Tatedo - Sustainable Energy Services Organization. All Rights Reserved. Designed by microsafi.com